Chillers Spec Kit

COOLING PLANT

Chillers spec kit

The chiller plant is the biggest cooling load in most data centers, hospitals and mission critical buildings. It makes the cold water everything else uses. Get the spec right and the plant runs for decades. Get it wrong and every other trade pays for it.

Built for specifiersCopy and paste spec languagePlain English

Where it fits in a critical building

1Central plant, one or more chillers feeding a chilled water loop
2Data hall cooling, CRAH units and liquid cooling CDUs downstream
3Hospital central plants serving air handlers and process loads
4Free cooling and heat recovery tie ins on the same loop
5Redundant plants with N+1 or 2N layouts

What to put in the spec

1Capacity at design and part load conditions, with entering and leaving water temperatures
2Compressor type: centrifugal, screw or scroll, and magnetic bearing options
3Efficiency at part load, not just full load (IPLV and NPLV)
4Refrigerant type and the plan for future phase downs
5Starter or drive type and harmonics limits
6Controls integration over BACnet or Modbus
7Sound, vibration and seismic requirements
8Factory witness test and field startup requirements

Starter spec language

Furnish water cooled chillers rated per AHRI 550/590 at the design conditions on the schedule.

Provide part load performance data at 100, 75, 50 and 25 percent load with the submittal.

Chillers shall include a factory tested control panel with BACnet integration to the building management system.

Contractor shall provide factory startup by the manufacturer and a written startup report.

Provide a minimum written warranty period as stated in the project specification.

Starter language only. Edit it for your project and check it against the current standards and your own master spec.

Standards to reference

  • AHRI 550/590 and 551/591 rating standards
  • ASHRAE 90.1 and 90.4 efficiency requirements
  • ASHRAE 15 refrigeration safety
  • ASME Section VIII pressure vessels
  • UL 1995 heating and cooling equipment

Questions to ask the manufacturer

  • What happens to capacity if entering condenser water runs warmer than design?
  • What is the lead time on the exact model, and on spare parts?
  • Who does factory startup and how soon after delivery?
  • What is the plan for the refrigerant if rules change?
  • Can the unit ride through a power dip without a full restart?

Companies commonly specified

TraneCarrierJohnson Controls (York)Daikin AppliedMitsubishi Electric TraneSmardt

Examples only, in no order. This is not an endorsement or a complete list. Always check current ratings and availability with the manufacturer.

Eco Business News

More kits and guides at Spec Kits and Eco Guides.

Information is general and for planning only.