CDUs and Liquid Cooling spec kit
AI racks run too hot for air alone. A coolant distribution unit, or CDU, sits between the building water and the liquid that goes to the chips. It is a new spec area, so a clear spec helps everyone.
Where it fits in a critical building
What to put in the spec
Starter spec language
Furnish liquid to liquid CDUs sized for the heat load and temperatures on the schedule.
Provide N+1 pumps with automatic changeover and alarm.
Wetted materials shall be compatible with the secondary fluid named in the project specification.
Provide filtration at the stated micron rating on the secondary side.
Provide integrated leak detection with an alarm to the building management system.
Starter language only. Edit it for your project and check it against the current standards and your own master spec.
Standards to reference
- ASHRAE TC 9.9 liquid cooling guidelines
- Open Compute Project liquid cooling specifications
- UL 1995 listing
- ASHRAE 90.4
- Owner and chip maker fluid requirements
Questions to ask the manufacturer
- What happens to the racks if one pump fails?
- What fluid and filtration does the chip maker require?
- How fast does the CDU respond when the rack load jumps?
- How are leaks found and where does the fluid go?
- How many racks per CDU, and what is the next size up?
Companies commonly specified
Examples only, in no order. This is not an endorsement or a complete list. Always check current ratings and availability with the manufacturer.