Standby Generators spec kit
When the grid goes away, generators carry the building. The spec has to cover start time, fuel, emissions and how many hours the owner needs to run.
Where it fits in a critical building
What to put in the spec
Starter spec language
Furnish generator sets rated per ISO 8528 at the site conditions on the schedule.
Systems shall comply with NFPA 110 for emergency and standby power.
Units shall start and accept the specified step loads within the time stated.
Provide emissions certification as required by the local air permit.
Provide factory testing and on site load bank acceptance testing.
Starter language only. Edit it for your project and check it against the current standards and your own master spec.
Standards to reference
- ISO 8528 generating sets
- NFPA 110 emergency and standby power
- UL 2200 stationary engine generators
- EPA emissions tiers
- NFPA 37 stationary engines
Questions to ask the manufacturer
- How fast does it start and take the first load step?
- How many hours of fuel are on site at full load?
- What emissions tier is this unit and what hours does the permit allow?
- What is the lead time on this set, and on the paralleling gear?
- Who services it in our area and how fast?
Companies commonly specified
Examples only, in no order. This is not an endorsement or a complete list. Always check current ratings and availability with the manufacturer.