Chillers spec kit
The chiller plant is the biggest cooling load in most data centers, hospitals and mission critical buildings. It makes the cold water everything else uses. Get the spec right and the plant runs for decades. Get it wrong and every other trade pays for it.
Where it fits in a critical building
What to put in the spec
Starter spec language
Furnish water cooled chillers rated per AHRI 550/590 at the design conditions on the schedule.
Provide part load performance data at 100, 75, 50 and 25 percent load with the submittal.
Chillers shall include a factory tested control panel with BACnet integration to the building management system.
Contractor shall provide factory startup by the manufacturer and a written startup report.
Provide a minimum written warranty period as stated in the project specification.
Starter language only. Edit it for your project and check it against the current standards and your own master spec.
Standards to reference
- AHRI 550/590 and 551/591 rating standards
- ASHRAE 90.1 and 90.4 efficiency requirements
- ASHRAE 15 refrigeration safety
- ASME Section VIII pressure vessels
- UL 1995 heating and cooling equipment
Questions to ask the manufacturer
- What happens to capacity if entering condenser water runs warmer than design?
- What is the lead time on the exact model, and on spare parts?
- Who does factory startup and how soon after delivery?
- What is the plan for the refrigerant if rules change?
- Can the unit ride through a power dip without a full restart?
Companies commonly specified
Examples only, in no order. This is not an endorsement or a complete list. Always check current ratings and availability with the manufacturer.