CRAH and CRAC Units spec kit

CRAH units move the cold air through the data hall. CRAC units make their own cold with a compressor. Which one you pick shapes your plant, your piping and your efficiency for the life of the room.

Built for specifiersCopy and paste spec languagePlain English

Where it fits in a critical building

1White space cooling, raised floor and slab layouts
2Hot aisle and cold aisle containment
3Chilled water fed units off a central plant
4Edge rooms and smaller sites using direct expansion units
5Hospital and lab areas needing tight temperature and humidity control

What to put in the spec

1Sensible cooling capacity at the real supply and return air temperatures
2Airflow and external static pressure at the unit
3EC fan type, count and redundancy inside the unit
4Humidification and reheat, and whether you truly need them
5Chilled water coil and valve selection
6Filtration rating and access for service
7Controls and unit to unit staging
8Footprint, service clearance and floor loading

Starter spec language

Furnish chilled water computer room air handlers rated per AHRI 1360 at the design conditions.

Units shall use EC fans with N+1 fan redundancy inside each unit.

Provide factory mounted two way control valves with the actuator listed on the schedule.

Supply and return sensors shall be factory installed and wired to the unit controller.

Provide a unit to unit network with the building management system on BACnet.

Starter language only. Edit it for your project and check it against the current standards and your own master spec.

Standards to reference

  • AHRI 1360 computer room air conditioners
  • ASHRAE TC 9.9 thermal guidelines for data centers
  • UL 1995 listing
  • ASHRAE 90.4 energy standard
  • NFPA 75 information technology equipment

Questions to ask the manufacturer

  • What is the real capacity at our return air temperature, not the catalog point?
  • How many fans can fail before capacity drops?
  • How long does a filter or fan swap take with the unit running?
  • What happens to airflow if the controls network drops?
  • What are the lead times for the fan and valve assemblies?

Companies commonly specified

VertivSchneider ElectricSTULZAiredale by ModineMuntersRittal

Examples only, in no order. This is not an endorsement or a complete list. Always check current ratings and availability with the manufacturer.

Eco Business News

More kits and guides at Spec Kits and Eco Guides.

Information is general and for planning only.