UPS and Batteries spec kit
The UPS keeps the load running through the first seconds and minutes of a power problem. Battery choice, efficiency and redundancy are the big calls, and they are expensive to change later.
Where it fits in a critical building
What to put in the spec
Starter spec language
Furnish a double conversion UPS rated per IEC 62040-3 at the kW load on the schedule.
Battery systems shall be listed to UL 9540A where lithium ion is used.
Provide input harmonic distortion below the limit stated in the project specification.
Provide remote monitoring with a secure network interface.
Provide factory acceptance testing and field commissioning.
Starter language only. Edit it for your project and check it against the current standards and your own master spec.
Standards to reference
- UL 1778 and IEC 62040-3
- NFPA 70 and NFPA 70E
- NFPA 855 stationary energy storage
- UL 9540 and 9540A
- IEEE 1184 UPS battery selection
Questions to ask the manufacturer
- What is the efficiency at 25 and 50 percent load?
- How long does a module take to swap, and can it be done live?
- What is the battery fire plan and the room rating?
- How much room does the lineup need for service?
- What does a service contract cover, and how fast do they arrive?
Companies commonly specified
Examples only, in no order. This is not an endorsement or a complete list. Always check current ratings and availability with the manufacturer.