At this year’s RE+ conference, Hithium, one of the world’s leading providers of energy storage solutions, launched a new AI Data Center Energy Storage System (ESS) designed to meet the fast-growing energy demands of hyperscale facilities while supporting the global green transition.
The highlight of the portfolio is the ∞Power 6.25MWh, 8-hour long-duration battery energy storage system (BESS), paired with the ∞Power N2.28MWh, 1-hour sodium-ion BESS. Together, these complementary systems provide both the stable, long-duration backbone and the rapid-response power surge capability that AI data centers require. Hithium also introduced a dedicated lifespan assessment model tailored for AI workloads, giving operators deeper insight into system degradation and reliability under high-intensity computing environments.
Meeting the AI Data Center Challenge
As AI adoption accelerates, data centers face two major challenges:
Support authors and subscribe to content
This is premium stuff. Subscribe to read the entire article.