Data center construction is a multi year process that turns land and a power connection into a secure building full of computing equipment. Each step has its own risks and timeline.

Step one: site and power
Everything starts with finding land, water access and a reliable power supply. Because grid connections can take years, power often decides where a project can go.
Step two: design
Engineers decide the size, the cooling approach and the level of redundancy. Many owners aim for a tier level, a rating of how resilient the site is. The Uptime Institute explains these tiers.
Step three: building
Crews pour foundations, erect the shell and install the electrical and mechanical systems, including chillers, pumps, piping and valves. Equipment lead times can shape the schedule.
Step four: commissioning
Before any customer equipment arrives, the whole system is tested under load. Testing finds problems while they are cheap to fix.
Why it matters
The speed and quality of this process affect cost, energy use and reliability. To read more on one piece, see our guide to liquid cooling for data centers.