The grid interconnection queue is the waiting line for new power plants and storage that want to connect to the grid. Long waits there slow the supply that new data centers depend on.
How big the line is
Lawrence Berkeley National Lab’s Queued Up report found about 10,300 projects, roughly 1,400 GW of generation and 890 GW of storage, waiting at the end of 2024. A later update shows about 2,061 GW still active at the end of 2025, after more than 750 GW withdrew that year.
How long it takes
The median time from request to commercial operation roughly doubled, from under 2 years for projects built from 2000 to 2007 to over 4 years for those built from 2018 to 2024. The later update says more than 5 years for regions with data.
Get the Eco Business News newsletter. Free.
Plain news on eco, business and data centers. No spam.
What gets built
Of requests submitted from 2000 to 2019, 13 percent reached operation by the end of 2024 and 77 percent were withdrawn.
Important caveats
This data covers power plants seeking to connect, not data centers drawing power, which is a separate process. I found no Berkeley Lab figure for data center load waits. The 4 year and 5 year numbers come from different editions, so do not blend them.
What this means for developers
Check queue rules and timelines in your region before you commit to a site. Projects with signed agreements and strong sponsors tend to stay in the line longer.
Talk to the utility early, and ask what supply is likely to be ready in your time frame.
The takeaway
Supply takes time to build. Planning data center growth with the grid in mind saves years.
Every figure in this article comes from the sources listed below, and where a number is company reported we say so. Our Eco Tools page has calculators for water, PUE, carbon and efficiency payback if you want to test the ideas yourself. If you spot a mistake, tell us and we will fix it.
Tell us what you are building and what changed. Our newsroom reads every submission.
Submit your companySources: Berkeley Lab Queued Up 2025; Berkeley Lab queue update. Figures marked as company reported come from the company itself.
Quick recap
- The short version: Listen to this article 1x 1.25x 1.5x (function(){var w=document.currentScript.parentNode;var b=w.querySelector(‘.ebn-lb’),t=w.querySelector(‘.ebn-lt’),s=w.querySelector(‘.ebn-ls’);if(!(‘speechSynthesis’ in window)){w.style.display=’none’;return}var root=w.closest(‘.content-inner’)||document;var q=[],i=0,on=false;function build(){q=[];root.querySelectorAll(‘p,h2’).forEach(function(e){if(e.closest(‘.ebn-listen,.ebn-sub-end’))return;var x=e.textContent.trim();if(x.length>2)q.push(x)});return q}function words(){return build().join(‘ ‘).split(/\s+/).length}t.textContent=Math.max(1,Math.round(words()/160))+’ min listen’;function say(){if(!on||i>=q.length){on=false;b.textContent=’Listen to this article’;b.className=’ebn-lb’;i=0;return}var u=new SpeechSynthesisUtterance(q[i]);u.rate=parseFloat(s.value);u.lang=’en-US’;u.onend=function(){i++;say()};speechSynthesis.speak(u)}b.onclick=function(){if(on){on=false;speechSynthesis.cancel();b.textContent=’Listen to this article’;b.className=’ebn-lb’;return}build();i=0;on=true;b.textContent=’Stop listening’;b.className=’ebn-lb ebn-on’;speechSynthesis.cancel();say()};s.onchange=function(){if(on){speechSynthesis.cancel();say()}};window.addEventListener(‘beforeunload’,function(){speechSynthesis.cancel()})})(); The grid interconnection queue is the waiting line for new power plants and storage that want to connect to the grid.
- How big the line is: Lawrence Berkeley National Lab’s Queued Up report found about 10,300 projects, roughly 1,400 GW of generation and 890 GW of storage, waiting at the end of 2024.
- How long it takes: The median time from request to commercial operation roughly doubled, from under 2 years for projects built from 2000 to 2007 to over 4 years for those built from 2018 to 2024.
- What gets built: Of requests submitted from 2000 to 2019, 13 percent reached operation by the end of 2024 and 77 percent were withdrawn.
- Important caveats: This data covers power plants seeking to connect, not data centers drawing power, which is a separate process.
- What this means for developers: Check queue rules and timelines in your region before you commit to a site.
- The takeaway: Supply takes time to build.
Questions readers ask
What should I know about the short version?
Long waits there slow the supply that new data centers depend on.
What should I know about how big the line is?
A later update shows about 2,061 GW still active at the end of 2025, after more than 750 GW withdrew that year.
What should I know about how long it takes?
The later update says more than 5 years for regions with data. Get the Eco Business News newsletter.
What should I know about what gets built?
Of requests submitted from 2000 to 2019, 13 percent reached operation by the end of 2024 and 77 percent were withdrawn.
What should I know about important caveats?
I found no Berkeley Lab figure for data center load waits. The 4 year and 5 year numbers come from different editions, so do not blend them.
What should I know about what this means for developers?
Projects with signed agreements and strong sponsors tend to stay in the line longer. Talk to the utility early, and ask what supply is likely to be ready in your time frame.
Test yourself
- In one sentence, how would you explain the short version to a friend? Compare your answer with the section above.
- In one sentence, how would you explain how big the line is to a friend? Compare your answer with the section above.
- In one sentence, how would you explain how long it takes to a friend? Compare your answer with the section above.
- In one sentence, how would you explain what gets built to a friend? Compare your answer with the section above.